With the equipment and software in the laboratory, students will be able to simulate real substation operation and detect and prevent disturbances in the electrical system.<\/div>","protected":false},"excerpt":{"rendered":"
On Tuesday, 25 August 2020, Siemens continued its partnership with STEI ITB by providing a grant in the form of Automation System & Substation Protection equipment. The grant-giving event is […]<\/p>\n","protected":false},"author":1,"featured_media":9351,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[272],"tags":[],"class_list":["post-9395","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/stei.itb.ac.id\/redesign\/en\/wp-json\/wp\/v2\/posts\/9395","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stei.itb.ac.id\/redesign\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stei.itb.ac.id\/redesign\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stei.itb.ac.id\/redesign\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/stei.itb.ac.id\/redesign\/en\/wp-json\/wp\/v2\/comments?post=9395"}],"version-history":[{"count":0,"href":"https:\/\/stei.itb.ac.id\/redesign\/en\/wp-json\/wp\/v2\/posts\/9395\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stei.itb.ac.id\/redesign\/en\/wp-json\/wp\/v2\/media\/9351"}],"wp:attachment":[{"href":"https:\/\/stei.itb.ac.id\/redesign\/en\/wp-json\/wp\/v2\/media?parent=9395"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stei.itb.ac.id\/redesign\/en\/wp-json\/wp\/v2\/categories?post=9395"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stei.itb.ac.id\/redesign\/en\/wp-json\/wp\/v2\/tags?post=9395"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}